watsapp-icon
NOC Renewal from CGWA | NOC Application Format - Bhoojal Survey

NOC Renewal From CGWA

Get Free Expert Assistance

-->
NOC Renewal - Bhoojal Survey

Bhoojal Survey provides consultancy services for getting Renewal of NOC from CGWA NOC obtained from CGWA has an expiry period. It is mandatory to file renewal of NOC through NOCAP portal before expiry of NOC.

IF an industry / Infrastructure project fails to file NOC renewal within expiry period it may face penalty in the form of illegal withdrawal of ground water and environment compensation. Renewal window opens 90 days prior to expiry of NOC. Application fees of 5000/- Rs along with advance payment of ground water abstraction charges are required to be paid for renewal process.

To know more about Documents Required for Renewal Industries Click Here

Groundwater charges calculation


To know more about Groundwater charges calculation, Click Here

Some major List of documents required for getting renewal of NOC from CGWA or Extending validity period of NOC

  1. Affidavit on compliance of NOC conditions for renewal cases, in case of water requirement is less than 100 KLD
  2. Photographs of Installed flow meter, pizometer and Rainwater harvesting structures
  3. Water audit report if water requirement is more than 100 KL per Day
  4. Impact Assessment report if water requirement is more than 100 KL per day
  5. Pre monsoon and Post monsoon ground water test report
  6. Water level record

Document list may vary depending on water requirement and guideline revisions.

To know more about NOC conditions, Click Here

Ground water demand can be increased / decreased as per requirement of proponent at the time of filing of renewal of NOC from CGWA.

After careful examination of the documents presented by the applicant, the Central Ground Water Board issues renewal of NOC. NOCAP is the name of the online application submission method. Renewal of NOC shall be issued for the period as per assessment unit category and type of water use as mentioned below

Category Use Validity of NOC
Critical, Semi-critical and Safe Infrastructure projects for drinking & domestic use and urban Water Supply Agencies 5 years
Industries 3 years
Mines 2 years
Over exploited All users in ‘Over-exploited areas’ 2 years

Will it be allowed to apply for renewal after validity expiry of NOC?

Yes, but the project proponent shall be liable to pay environmental compensation for the period starting from the date of expiry of NOC, till NOC is renewed by the competent authority. Bhoojal Survey has successfully provided consultancy services for Renewal of NOC from CGWA for extraction of ground water to many clients in recent past

Flowmeter - Bhoojal Survey

Flow meter

STP - Bhoojal Survey

STP

Rainwater harvesting structure - Bhoojal Survey

Rainwater harvesting structure

List of some recent Clients:

Indian Oil Logo HPCL Logo Graphite India Logo Coal India Logo Infosys Logo NTPC Logo John Deere Logo Yash Technologies Logo Adani Ports Logo Cipla Logo lupin Logo unilever Logo