Complete Document Checklist for All CGWA NOC Applications (Industry, Infrastructure, Mining)
Obtaining a Central Ground Water Authority (CGWA) NOC is a mandatory requirement before extracting groundwater for industrial, infrastructure, or mining projects. To avoid delays and rejections, it is important to prepare all required documents carefully as per CGWA guidelines.
Bhoojal Survey provides expert consultancy for preparing, compiling, and submitting documents for CGWA NOC applications across India. Here’s the complete checklist to help you understand the documentation process.
General Documents Required for All CGWA NOC Applications
- 1. PAN and Aadhaar of the applicant / company directors
- 2. Certificate of Incorporation / Partnership Deed / MSME Registration
- 3. Land ownership proof / Lease deed / Allotment letter
- 4. Location plan and Google map with GPS coordinates
- 5. Site layout plan showing proposed borewell / tube well locations
- 6. Project report with water balance details
- 7. Details of raw materials, production capacity, and processes
- 8. Electricity requirement and source details
- 9. Rainwater harvesting & recharge structure proposal
- 10. Copy of statutory clearances (where applicable – MoEF, PCB, etc.)
Additional Documents for Industrial Projects
- 1. Manufacturing process flow chart
- 2. Water consumption and wastewater generation details
- 3. Effluent Treatment Plant (ETP) / Sewage Treatment Plant (STP) design and details
- 4. Air and water pollution consent from State Pollution Control Board (if applicable)
- 5. Investment certificate certified by a Chartered Accountant
Additional Documents for Infrastructure Projects
- 1. Approved building / layout plan from local authority
- 2. Details of population served / expected users
- 3. Water demand calculations with breakup (domestic, flushing, landscaping, firefighting)
- 4. STP details with recycling and reuse plan
- 5. CGWA-approved piezometer installation proposal for water level monitoring
Additional Documents for Mining Projects
- 1. Mining lease / approval document from State authority
- 2. Approved mining plan with production details
- 3. Groundwater intersection and dewatering requirement report
- 4. Hydrogeological survey report of mining site
- 5. Compliance with environmental clearance conditions
Our CGWA NOC Support Services
- 1. Preparation and compilation of complete document sets
- 2. Online application filing on NOCAP portal
- 3. Hydrogeological survey reports for CGWA compliance
- 4. Guidance on recharge structures and piezometer installation
- 5. Liaison and follow-up with CGWA officials until NOC approval
Frequently Asked Questions (FAQs)
- Q1. How long does it take to get CGWA NOC?
It generally takes 60–90 days depending on the category of project and completeness of documents. - Q2. Is a hydrogeological survey mandatory?
Yes, a certified hydrogeological survey report is mandatory for all CGWA NOC applications. - Q3. Can Bhoojal Survey assist with both CTE and CGWA NOC?
Yes, we provide end-to-end support for CTE, CTO, and CGWA approvals. - Q4. Do small industries also need CGWA NOC?
Yes, any project extracting groundwater requires NOC regardless of size.
Get Professional Assistance for CGWA NOC Documentation
Bhoojal Survey offers complete support for CGWA NOC applications, ensuring accurate documentation, compliance, and faster approvals. Whether it’s industry, infrastructure, or mining, our expert team ensures a smooth process.
For consultation and CGWA NOC document preparation services, visit Bhoojal Survey & Recharging or connect with our experts today.