Professional Fire NOC Consulting Services
Bhoojal Survey provides end-to-end Fire NOC consultancy services designed to help industries, commercial buildings, residential complexes, educational institutions, hospitals, warehouses, malls, hotels, and corporate facilities meet mandatory fire safety compliance. Our expertise ensures seamless documentation, on-site audits, preparation of fire safety drawings, installation guidance, and liaison with Fire Departments until the final NOC approval is granted.



What is Fire NOC?
A Fire NOC (No Objection Certificate) is an official approval from the Fire Department certifying that a building follows all required fire safety norms as per the National Building Code (NBC 2016), local bye-laws, and state fire regulations. This certificate is mandatory for new buildings before occupancy as well as for operational renewal depending on local compliance requirements.
Why Fire NOC is Mandatory?
- Ensures the building has proper fire-fighting systems (hydrants, sprinklers, alarms, extinguishers).
- Prevents fire-related accidents and enhances occupant safety.
- Mandatory for applying for licenses, approvals, or commercial operations.
- Required for insurance claims and legal compliance.
- Avoids penalties, closure notices, or legal action from authorities.
Types of Buildings Requiring Fire NOC
- Industries & Manufacturing Plants
- High-rise Residential Apartments
- Commercial Offices & Corporate Buildings
- Shopping Malls, Retail Stores & Cinemas
- Warehouses & Logistics Centres
- Educational Institutions & Schools
- Hospitals & Healthcare Facilities
- Hotels, Restaurants & Banquet Halls
Fire NOC Services Offered by Bhoojal Survey
- Fire Safety Audit & Compliance Gap Assessment
- Preparation of AutoCAD Fire Safety Drawings
- Hydrant & Sprinkler System Design
- Fire Alarm & Detection System Layout Planning
- Emergency Exit Plans & Evacuation Maps
- On-site Installation Support & Vendor Coordination
- Application Submission to Local Fire Authority
- Inspection Scheduling & Liaison until Approval
- Fire NOC Renewal Services
Fire NOC Approval Process
- Step 1 – Site Survey & Fire Audit: Our engineer visits the site, evaluates risks, and identifies compliance gaps.
- Step 2 – Fire Safety System Design: We prepare detailed system drawings, calculations, and required safety layouts.
- Step 3 – Documentation Compilation: Building plans, ownership proof, compliance reports, and system details are compiled.
- Step 4 – Application Submission: Submission of documents to the Fire Department through offline/online mode.
- Step 5 – Fire Officer Inspection: On-site inspection is scheduled to verify installed fire systems.
- Step 6 – Compliance Corrections (if any): Any gaps identified are resolved with technical guidance.
- Step 7 – Final Fire NOC Approval: Once compliant, the NOC certificate is issued.
Documents Required for Fire NOC
- Building Layout & Site Plan
- Architectural Drawings (Floor Plan, Sections, Elevations)
- Fire-Fighting System Design Layouts
- Occupancy Certificate (if applicable)
- Electrical Load Certificate
- Building Completion Certificate (for new structures)
- Application Letter from Owner/Company
- Stability Certificate from Structural Engineer
- Details of Installed Fire-Fighting Equipment
Why Bhoojal Survey is India's Trusted Fire NOC Consultant
Bhoojal Survey is recognized as one of India’s most reliable fire safety consultancy providers with decades of experience across industrial, residential, and commercial infrastructure. Our Fire NOC services are built on technical accuracy, timely submission, and strong liaison with government departments, ensuring fast and smooth approvals.
- Over 1200+ Fire NOC projects completed successfully
- Expert team of Fire Engineers, NBC specialists, and safety auditors
- Accurate fire safety drawings & compliance documentation
- Strong presence across India with quick service delivery
- Affordable & transparent pricing model
Cost of Obtaining Fire NOC
Fire NOC charges vary based on:
- Type & height of building
- Total built-up area
- Fire-fighting system requirements
- Location & municipal guidelines
Bhoojal Survey provides cost-effective packages with complete compliance support.
Case Study – Fire NOC for a Large Industrial Plant
Our team conducted a full fire risk audit, redesigned hydrant loops, installed missing sprinklers, and ensured emergency exits met NBC standards. The Fire Department approved the NOC within 30 days following our documentation and inspection support.
Frequently Asked Questions (FAQ)
How long does Fire NOC approval take?
Approval times vary by jurisdiction, but typically range from 4–12 weeks depending on the completeness of documentation and any corrective actions required.
Is Fire NOC mandatory?
Yes — for many building types and industrial activities, a Fire NOC is mandatory before occupancy or operation.
Can Bhoojal Survey handle renewals?
Yes. We assist with renewal submissions, periodic inspections, and updates to fire safety systems as rules change.